The beam is still unchanged. We just start a run to collect all remaining data.
Data is probably scratch, expect changing conditions at the machines during the run.
No counts in Target ON phase at Silicon Detector. Probably we had only two first shoots from FRS in this run (see picture below)
open file : run088
beam: 118Te52+ (?)
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 17:48:58 , first file: run088_0001.lmd
run stop at , last file: run_0xxx.lmd
_______________________________________________________________________________
time: 17:53 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 3 Hz
Xray_90: 54 Hz
Xray_145: 28 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.05 uA
SIS particles before: ~2.3e9
ESR current at injection: 6.5 uA
ESR particles after decel.:
Target ON density: 8.45e13
copy and repeat the above (below the line) every 30 minutes |