HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 207     Entry time: Sun Mar 22 22:46:56 2020
Author: Michael, Laszlo, Yuri 
Category: Runs 
Subject: run entry - run090 
Year:  
Taking data again with primary beam.

open file : run090

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 23:07:10, first file: run087_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 23:10 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   83 Hz
Xray_145:  14 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  3.98 uA


SIS particles before:           ~2e8
ESR current at injection:       297 uA
ESR particles after decel.:     
Target ON density:              6.1e13

copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b