HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 216     Entry time: Mon Mar 23 03:04:56 2020
Author: Shahab 
Category: Runs 
Subject: run entry - run093 
Year:  
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 03:04, first file: run093_0001.lmd
run stop  at 00:59:55, last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 03:04

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    3 Hz
Xray_90:    34 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.18 uA


SIS particles before:           4.9e8
ESR current at injection:      
ESR particles after decel.:     8.7e6
Target ON density:              5.55e13

copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b