HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 229     Entry time: Mon Mar 23 08:20:31 2020
Author: Shahab, Laszlo,Yury 
Category: Runs 
Subject: run entry - run095 
Year:  
open file : run095

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 08:17, first file: run095_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       2 Hz
Si_Y:       2 Hz
Xray_35:    5 Hz
Xray_90:    84 Hz
Xray_145:   18 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.32 uA


SIS particles before:           5.6e8
ESR current at injection:      
ESR particles after decel.:     ~8.64e6
Target ON density:              3.8e13

copy and repeat the above (below the line) every 30 minutes
Attachment 1: 2020-03-23_08-31-45-715.png  128 kB  | Hide | Hide all
2020-03-23_08-31-45-715.png
ELOG V3.1.5-fc6679b