HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 230     Entry time: Mon Mar 23 08:51:01 2020
Author: Laszlo,Yury 
Category: Runs 
Subject: run entry - run095 
Year:  
open file : run095

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER in scraping poisition--> We expect to cut the Rutherford for now on.

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 08:17, first file: run095_0001.lmd
run stop  at , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 08:10

ON Rates
Si_X:       4 Hz
Si_Y:       4 Hz
Xray_35:    6 Hz
Xray_90:    60 Hz
Xray_145:   22 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.30 uA


SIS particles before:           2.5e8
ESR current at injection:       5.7e7
ESR particles after decel.:     1e7 (it is hard to catch exactly)
Target ON density:              4.3e13

copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b