HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 30     Entry time: Thu Dec 5 10:57:57 2019
Author: Jan, Laszlo 
Category: Detectors 
Subject: setting up the DSSD with beam 
Year:  
This is a brief how-to about getting the DSSSD set up with stored beam and target in the ESR.

The main goals
1. adjust timing signals to TDC-range
2. adjust energy signals to ADC-range
3. optimize energy resolution

The signal chain is the following:

det [32ch.] > preamp [2x16ch] > 2x MSCF shapers [16ch]
ELOG V3.1.5-fc6679b