HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 357     Entry time: Thu May 20 17:31:50 2021
Author: Jan, Laszlo, Beatriz 
Category: General 
Subject: beam & target alignement 
Year: 2021 
beam and target alignement was checked by looking at the Xray rates. Best case when:
Target bump (position) SC 9: -18.5mm

(We were aiming to keep the particles in the beam at a const. level when target switched ON)
pos   bdt
-21   800
-20   1000
-19   1300
-18   1300
-17   1000
-16   500
ELOG V3.1.5-fc6679b