HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 364     Entry time: Fri May 21 12:21:57 2021
Author: Jan 
Category: Runs 
Subject: Run 0053 
Year: 2021 
open file : e127b_run0053.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Illumination of the detector to see if the gain settings are ok.
Spectra look reasonable, rates are low.

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 12:21:34 21-05-2021
run stop: 14:05:27 21-05-2021

_______________________________________________________________________________

ON Rates
Si_bdt: 15 Hz
Xray_35: 20 Hz
Xray_90: 200 Hz
Xray_145: 70 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 360 uA


SIS particles before:
ESR current at injection: 3e7
ESR particles after decel.: 5e6
Target ON density: 9e13
ELOG V3.1.5-fc6679b