HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 366     Entry time: Fri May 21 15:15:59 2021
Author: Jan 
Category: Runs 
Subject: Run 0055 
Year: 2021 
open file : e127b_run0055.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Illumination of the detector to see if the gain settings are ok.
Spectra look reasonable, rates are low.

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 15:14:48 21-05-2021
run stop: 15:10:10 21-05-2021

_______________________________________________________________________________

ON Rates
Si_bdt: 21 Hz
Xray_35: 143 Hz
Xray_90: 7 Hz
Xray_145: 63 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 350 uA


SIS particles before:
ESR current at injection:
ESR particles after decel.:
Target ON density: 10e13
ELOG V3.1.5-fc6679b