HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 372     Entry time: Fri May 21 22:01:32 2021
Author: Cobus, Michele, Jan 
Category: Runs 
Subject: Run 0059 
Year: 2021 
open file : e127b_run0059.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 23:51:28 21-05-2021
run stop: 00:51:28 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 50 Hz
Xray_ON_bdt: 500 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 6.5e7
ESR current at injection: 2.3e7
ESR particles after decel.: 3e6
Target ON density: 9.8e13
ELOG V3.1.5-fc6679b