HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 378     Entry time: Sat May 22 04:50:21 2021
Author: Cobus, Michele 
Category: Runs 
Subject: Run 0065 
Year: 2021 
open file : e127b_run0065.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 04:49:47 22-05-2021
run stop: 04:48:41 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 70 Hz
Xray_ON_bdt: 650 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 340 uA


SIS particles before: 1.1e8
ESR current at injection: 3.5e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
ELOG V3.1.5-fc6679b