HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 381     Entry time: Sat May 22 08:00:52 2021
Author: Beatriz, Yury 
Category: Runs 
Subject: Run 0068 
Year: 2021 
open file : e127b_run0068.lmd

beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:

purpose:
Reference measurement

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): out/not used

run start: 08:00:43 22-05-2021
run stop: 09:06:54 22-05-2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: 30 Hz
Xray_ON_bdt: 200 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 330 uA


SIS particles before: 2e7
ESR current at injection: 6e6
ESR particles after decel.: ~1e6
Target ON density: 1.0e14

The intensity is lower because they are preparing a 4He beam for R3B.
For a few minutes there were no particles in SIS.
We have quite some fluctuations in intensity in this run.
ELOG V3.1.5-fc6679b