HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
|
proton-capture on 118Te |
Not logged in |
|
|
Message ID: 399
Entry time: Sat May 22 22:25:42 2021
|
Author: |
Pierre-Michel & Enis |
Category: |
Runs |
Subject: |
Run 0078 |
Year: |
2021 |
|
|
open file : e127b_run0078.lmd
beam: 124Xe54+
energy: 7 MeV/u
cooler voltage:
purpose:
Reference measurement with scraper
Detector position (Si): -19 mm
GE01DD1IG position (Scraper): +7.5 mm (25mm away from beam)
run start: 22:25:23 22-05-2021
run stop: 23:27:16 22-05-2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 15 Hz
Xray_ON_bdt: 700 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 340 uA
SIS particles before: 9e7
ESR current at injection: 2.2e7
ESR particles after decel.: 2.5e6
Target ON density: 1.0e14
Info: Dipole MU2 did no longer work, reset during the run, tried to reset at 23:12 Uhr. Problem not solved at the end of the run. Problematic injection structure |