HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
|
proton-capture on 118Te |
Not logged in |
|
|
Message ID: 421
Entry time: Mon May 24 16:06:39 2021
|
Author: |
Jan, Laszlo, Piere-Michel, Enis |
Category: |
Runs |
Subject: |
Run 0097 |
Year: |
2021 |
|
|
Changed trafo offset during this file !!
No. of stacks: 10 (before 5)
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
open file : e127b_run0097.lmd
beam: 118Te52+
energy: 7 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 16:05:44 24.05.2021
run stop: 17:22:36 24.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: 75 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 410 uA
SIS particles before: 1.3e8
ESR current at injection: 1.3e6 (stacked)
ESR particles after decel.: 4e6
Target ON density: 1.0e14 |