HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 438     Entry time: Tue May 25 07:51:48 2021
Author: Jan 
Category: Accelerator 
Subject: ESR stacking cycle length 
Year: 2021 
The full cycle length of ESR with 30 stacks is about 7:45 minutes, out of which 15.5 sec are with target switched ON.
This is without CMB/HTD in parallel.
ELOG V3.1.5-fc6679b