HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 441     Entry time: Tue May 25 09:11:13 2021
Author: Oliver, Diego 
Category: Runs 
Subject: Run 0113 - stopped for ESR optimizations 
Year: 2021 
DAQ node2 was on pause!

No. of stacks: 30 (before 20)
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)

open file : e127b_run0113.lmd

beam: 118Te52+
energy: 7 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)

run start: 09:10:39 25.05.2021
run stop: 09:39:45 25.05.2021 stopped for ESR optimization
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~0 Hz
Xray_ON_bdt: 140 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 390 uA


SIS particles before: 3.3e9
ESR current at injection: 6.0e6 (stacked)
ESR particles after decel.: 1.5e6 (more or less)
Target ON density: 1.0e14
ELOG V3.1.5-fc6679b