HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
|
proton-capture on 118Te |
Not logged in |
|
|
Message ID: 456
Entry time: Wed May 26 01:29:00 2021
|
Author: |
Michele, Cobus |
Category: |
Runs |
Subject: |
Run 0122 |
Year: |
2021 |
|
|
No. of stacks: 20
length SC10: 3x 5.5s
bump ge01sq2f (sc10): -20 mm (before -10 mm)
open file : e127b_run0122.lmd
beam: 118Te52+
energy: 7 MeV/u
cooler voltage:
purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)
Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam)
run start: 01:28:13 26.05.2021
run stop: 02:30:27 26.05.2021
_______________________________________________________________________________
ON Rates
Si_ON_bdt: 2 ~ Hz
Xray_ON_bdt: 230 Hz
BaF_OR: ---
Si voltage: 100.0 V
Si leakage current: 380 nA
SIS particles before: 2.8e9 (one shoot)
ESR current at injection: 6.5e6 (stacked)
ESR particles after decel.: 1.8e6 (more or less)
Target ON density: 1.0e14 |