| 
HOME
ESR
EXPERIMENTS
LABS etc
 | 
| 
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
E0075
E0203_E0018
E0052_2025
 | 
|   proton-capture on 118Te  | 
Not logged in | 
  | 
   | 
| 
Message ID: 465
    Entry time: Wed May 26 10:34:18 2021
 |  
| Author: | 
Rene, Tino  | 
 | Category: | 
Runs  | 
 | Subject: | 
Run 0130  | 
 | Year: | 
2021  | 
 
  |  
 
 | 
No. of stacks: 20 
length SC10: 3x 5.5s  
bump ge01sq2f (sc10): -20 mm (before -10 mm) 
 
open file : e127b_run0130.lmd 
 
beam: 118Te52+ 
energy: 7 MeV/u 
cooler voltage:  
 
purpose:  
Fragment beam measurement (beating the record of rad. beam pg-measurement) 
 
Detector position (Si): -25 mm 
GE01DD1IG position (Scraper): +3.5 mm (20mm away from beam) 
 
run start: 10:33:13  26.05.2021 
run stop:  11:41:38  26.05.2021 
_______________________________________________________________________________ 
 
ON Rates 
Si_ON_bdt:   ~ 7 Hz  
Xray_ON_bdt: 240 Hz 
BaF_OR:     --- 
 
Si voltage:          100.0 V   
Si leakage current:  380 nA 
 
 
SIS particles before:      1.9e9 (one shoot) 
ESR current at injection:  4.2e6 (stacked)     
ESR particles after decel.: 1.4e6 (more or less) 
Target ON density:          1.0e14 
 
electron cooler stopped working at the end of run. hence no target-on rate  |