HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 498     Entry time: Thu May 27 14:33:05 2021
Author: Jan, Beatriz, Alex 
Category: Runs 
Subject: Run 0154 - crap run 
Year: 2021 
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0154.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 14:32:05 27.05.2021
run stop: 27.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 3 Hz
Xray_ON_bdt: 90 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 2.5e9 (one shoot)
ESR current at injection: 2.0e6 (stacked)
ESR particles after decel.: Unreadable
Target ON density: 1.0e14
ELOG V3.1.5-fc6679b