HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 81     Entry time: Fri Mar 20 10:28:31 2020
Author: Ragan, RuiJiu 
Category: Runs 
Subject: run entry - run050 
Year:  
Beam is back at 10:27 am.
Open file: runstart050

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -25 mm

run start at 10:27 , first file: run050_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 10:30

ON Rates
Si_X:      0 Hz
Si_Y:       0 Hz
Xray_35:  2 Hz
Xray_90:   35 Hz
Xray_145:   27 Hz
BaF_OR:    2441 Hz

Si voltage:          60.02 V  
Si leakage current:  3.98 uA


SIS particles before:           2e9
ESR particles at injection:     5.8e7
ESR particles after decel.:     1.3e7
Target ON density:              1.38e13


copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b