HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 82     Entry time: Fri Mar 20 11:00:25 2020
Author: Ragan, RuiJiu 
Category: Runs 
Subject: run entry - run050 
Year:  
Yuri and ESR team are optimising 
the deceleration in ESR.
DSSSD detector is taken out at 
10:55 am.

The HV for DSSD is switched off at 
11:10 am as the detector was out 
and the leak current was ~18 uA.
At 11:11 am, the file was closed.
File close: run050 stopped.

update by Laszlo: the increase of the leakage current is due to the fact that we have a vacuum measurement device next to the DSSSD when it is moved out. The phenomena is normal, the DSSSD is hit by electrons (or ions) coming from the vacuum measurement device. 
Attachment 1: IMG_20200320_111413.jpg  346 kB  | Show | Show all
ELOG V3.1.5-fc6679b