HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 85     Entry time: Fri Mar 20 16:54:53 2020
Author: Jan 
Category: DAQ 
Subject: BaF OFF downscaled red=32 
Year:  
I introduced a downscaling by a factor of 2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable x-ray counts (K-alpha, K-REC) outside target ON phase.
So i want to minimize our deadtime during target OFF, to be able to use the data efficiently if needed.
BaF2 is not really needed in target OFF.
ELOG V3.1.5-fc6679b