HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  proton-capture on 118Te  Not logged in ELOG logo
Message ID: 86     Entry time: Fri Mar 20 16:58:02 2020
Author: Jan 
Category: DAQ 
Subject: Xray2 & Xray3 cabling 
Year:  
We found that Xray2 and Xray3 the cabling is not consistent:

90 degree detector 
> E_Xray2 for energy
> t_Xray3 for times

145 degree detector
> E_Xray3 for energy
> t_Xray2 for timing

35 degree detector
> E_Xray1
> t_Xray1

We can run like this, but should be aware of it!
ELOG V3.1.5-fc6679b