360
|
Fri May 21 01:17:37 2021 |
Laszlo | Analysis | simple analysis code | 2021 | //a simple code (template) for offline analysis
//made by Laszlo, serves as a simple demonstration
for enthusiastic shifters
|
|
368
|
Fri May 21 19:20:54 2021 |
Laszlo | General | misalignment in the pattern | 2021 | for some reason the event number of the target
ON and OFF was misaligned with the pattern.
This means that the last few runs (run53, |
|
387
|
Sat May 22 16:28:10 2021 |
Laszlo | General | DSSSD movement | 2021 | The DSSSD is moved back to its measurement
position(-25mm). |
|
390
|
Sat May 22 17:13:48 2021 |
Laszlo | Detectors | Si position changed | 2021 | Si was moved from -25 mm to -19 mm before
run 0072. |
|
391
|
Sat May 22 17:15:26 2021 |
Laszlo | General | Scraper position | 2021 | We found the beam axis with the scraper to
be -17.5 mm.
The Scraper position set to +12.5 mm, 30 |
|
397
|
Sat May 22 21:33:22 2021 |
Laszlo | Detectors | Xray detectors are filled at 90 and 35 | 2021 | |
|
404
|
Sun May 23 02:16:47 2021 |
Laszlo | General | quick comparison between different scraping positions | 2021 | So far we did 3 scraping positions:
- 30mm away from beam axis (lmd72-75)
- 25mm away from beam axis (lmd78-80)
|
|
462
|
Wed May 26 07:08:07 2021 |
Laszlo | Calibration | quick and dirty calibration coefficients for the Si channels | 2021 | The coefficients are produced only quick and
dirty, S_x=1 was fixed to 1.
E = E_x = E_y = S_x*A_x = S_y*A_y
|
|
521
|
Fri May 28 14:14:31 2021 |
Laszlo | General | Alvarez failure at 10:30 28:05:2021 | 2021 | |
|
3
|
Wed Feb 6 10:04:23 2019 |
Laszlo Varga | Simulations | Background subtraction for 124Xe, 109In, 73As made by MOCADI | | General remarks to the MOCADI simulations:
scraper size vertically > (p,g) spot at the
scraping position --> (p,g) can be separated |
|
4
|
Wed Feb 6 10:16:09 2019 |
Laszlo Varga | General | Study on scraping | | A publication on scraping systems suggested
by Siegbert.
In the study they have used cylindrical "high-quality" |
|
388
|
Sat May 22 16:29:07 2021 |
Laszlo et al. | General | coolers are back | 2021 | we can measure again.
(please write a detailed description if needed) |
|
47
|
Sun Mar 15 17:12:40 2020 |
Laszlo, Jan | Detectors | new Ortec spec amps | | We are now using new SpecAmps for the x-ray
detectors from ORTEC, they deliver much improved
resolution but have other strange effects |
|
48
|
Sun Mar 15 17:13:21 2020 |
Laszlo, Jan | Calibration | the x-ray gate issue | | We found a strange behaviour of our ADC gates
for the x-ray detectors.
The setting as shown in the foto below corresponds |
|
62
|
Wed Mar 18 09:53:28 2020 |
Laszlo, Jan | General | vacuum after opening gate valve | | Gate valve to DSSSD setup was opened on Tue
17.03. ~9:00
|
|
149
|
Sat Mar 21 22:57:28 2020 |
Laszlo, Jan | DAQ | changing cables of the Xray 90 and 145 | | Energy signals of 90 and 145 degree detector
have been checked and exchanged
They were connected to the wrong ADC channel.
|
|
395
|
Sat May 22 20:46:19 2021 |
Laszlo, Pierre.Michel, Enis | General | new scraper position | 2021 | The scraper was moved into 2.5mm in absolute
which corresponds to 20mm away from the beam
axis.
|
|
400
|
Sat May 22 22:29:48 2021 |
Laszlo, Pierre.Michel, Enis | General | new scraper position | 2021 | The scraper was moved into 7.5 mm in absolute
which corresponds to 25 mm away from the
beam axis.
|
|
94
|
Sat Mar 21 02:00:08 2020 |
Laszlo, Tino, Oliver | Runs | run entry - run051 | | Beam is back at 01:59 am.
Open file: runstart051
|
|
95
|
Sat Mar 21 02:15:19 2020 |
Laszlo, Tino, Oliver | Runs | run entry - run051 | | Open file: runstart051
beam: 118Te52+
|
|