391
|
Sat May 22 17:15:26 2021 |
Laszlo | General | Scraper position | 2021 | We found the beam axis with the scraper to
be -17.5 mm.
The Scraper position set to +12.5 mm, 30 |
|
69
|
Fri Mar 20 01:22:23 2020 |
Shahab | Runs | Setting for Gas target | | Setting for the machines. |
|
35
|
Fri Feb 21 11:29:02 2020 |
Laszlo | General | Shift plan | | https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0 |
|
203
|
Sun Mar 22 19:15:03 2020 |
Laszlo | | Si moved out of the ring, high voltage is switched off | | |
|
390
|
Sat May 22 17:13:48 2021 |
Laszlo | Detectors | Si position changed | 2021 | Si was moved from -25 mm to -19 mm before
run 0072. |
|
199
|
Sun Mar 22 17:47:27 2020 |
Laszlo | | Si, Xrays target density spectra during 118Te afternoon measurement | | We got 30 counts out of this afternoon 118Te
run on our Si TargetON histo.
That 1 count at bin (6,10) I dont understand.
|
|
17
|
Tue Jul 9 15:26:59 2019 |
Yuanming Xing | Simulations | Simulated Rutherford scattering distribution on detector | | Simulated Rutherford scattering distribution
on detector
|
|
266
|
Tue Mar 24 10:59:18 2020 |
Jan | Calibration | Sources - Specifications | | We used the following sources:
[B]Am241[/B] (OM666) [GSI - Uwe]
|
|
422
|
Mon May 24 17:23:41 2021 |
Pierre-Michel, Enis | General | Status of gas-target cooling | 2021 | Around 17:15 cooling had "unknown status 6"
At 17:21 cooling: "pumping in progress"
Around 17:41 cooling had "unknown status |
|
63
|
Thu Mar 19 09:43:28 2020 |
Laszlo | General | Status of the ESR | | After two days of tuning the beam, yesterday
evening (~8pm), it was found out that within
one ESR pattern using the new control system |
|
367
|
Fri May 21 15:20:54 2021 |
Rui-Jiu Chen | Runs | Stop DAQ | 2021 | Sergey is optimizing beam cycle. |
|
4
|
Wed Feb 6 10:16:09 2019 |
Laszlo Varga | General | Study on scraping | | A publication on scraping systems suggested
by Siegbert.
In the study they have used cylindrical "high-quality" |
|
67
|
Fri Mar 20 01:11:58 2020 |
Laszlo | General | Target - beam jntersection | | We have managed to find the target position
with the beam by looking at the xray spectra.
The trick was that at 10mev we
|
|
115
|
Sat Mar 21 10:20:27 2020 |
Ragan, Alex | General | Target LN2 | | The LN2 Dewar on the ESR roof has been refilled. |
|
89
|
Fri Mar 20 22:51:36 2020 |
Laszlo | General | Target on signal change | | From the previous settings:
JetOn
mashine number 11
|
|
159
|
Sun Mar 22 01:36:14 2020 |
Pierre-Michel | Analysis | Target overlap | | Here are the data file for the rates of the
recoil detector for different values of the
target bump. The average rate over background |
10x |
571
|
Wed Jun 2 09:14:04 2021 |
Jan | General | Telegram Chat Export | 2021 | Attached is the exported Telegram chat.
There is the simple PDF and the zip-file
containing the chat in json-format as well |
|
284
|
Fri Oct 23 12:58:12 2020 |
Jan | Detectors | Test of 2nd DSSSD (gen2) | 2021 | This is the documentation of the source tests
with the 2nd micron DSSSD of 2nd generation
(label 3288-17, thickness 529um)
|
|
285
|
Fri Nov 20 15:53:37 2020 |
Jan | Analysis | Test of 2nd DSSSD (gen2) | 2021 | Here is the analysis of the test runs with
the 2nd DSSD (gen2) using the quick_si_plots.c
script attached.
|
|
16
|
Mon Jul 8 14:57:07 2019 |
Yuanming Xing | Detectors | The measurement of the tilting angle | | As shown in the figure, the detector is tilted
by a certain angle which is about 45 degree.
|
|