HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 10 of 29  Not logged in ELOG logo
Entry  Wed May 26 11:47:48 2021, Rene, Tino, Runs, Run 0131, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Wed May 26 12:49:52 2021, Rene, Tino, Runs, Run 0132, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Wed May 26 13:49:36 2021, Rene, Tino, Runs, Run 0133, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm (before -10 mm)
Entry  Wed May 26 14:28:23 2021, Jan, Analysis, Xrays from 118Te & 124Xe, 2021 xray90_124Xe_118Te.png
Attached is a plot of the uncalibrated energy spectra taken with the 90 degree xray detector for 118Te (red) and 124Xe (blue).
Shown is the region covering the K-alpha and K-REC peaks.
Entry  Wed May 26 14:48:10 2021, Ragan, Thanassis, Runs, Run 0134, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Wed May 26 15:30:03 2021, Ragan, Thanassis, General, Changing the beam energy , 2021 
The ESR team is changing the beam energy to 6 MeV/u.
Entry  Wed May 26 18:36:08 2021, Ragan, Thanassis, Runs, Run 0135, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Wed May 26 18:37:34 2021, Ragan, Thanassis, General, Optimization target bump/overlapp, 2021 
| bump position | X ray bdt ON | Si rate ON |
---------------------------------------------
| -11.5         | 120          | 4-5        |
Entry  Wed May 26 19:08:17 2021, Ragan, Thanassis, General, Cooler down, 2021 
We stopped data taking as the electron cooler is down.
Entry  Wed May 26 19:25:54 2021, Ragan, Thanassis, Runs, Run 0136, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Wed May 26 20:26:15 2021, Ragan, Thanassis, Runs, Run 0137, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Wed May 26 20:34:50 2021, Ragan, Thanassis, Detectors, Detector filling, 2021 
Jan is filling the detector after run0137.
Entry  Wed May 26 20:42:31 2021, Ragan, Thanassis, Runs, Run 0138, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Wed May 26 21:42:46 2021, Ragan, Thanassis, Runs, Run 0139, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Wed May 26 22:42:56 2021, Ragan, Thanassis, Runs, Run 0140, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Wed May 26 23:46:49 2021, Pierre-Michel, Enis, Runs, Run 0141, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Thu May 27 00:46:33 2021, Pierre-Michel, Enis, Runs, Run 0142, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Thu May 27 01:46:48 2021, Pierre-Michel, Enis, Runs, Run 0143, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Thu May 27 02:47:00 2021, Pierre-Michel, Enis, Runs, Run 0144, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Thu May 27 03:47:18 2021, Pierre-Michel, Enis, Runs, Run 0145, 2021 
No. of stacks: 20
length SC10: 3x 5.5s 
bump ge01sq2f (sc10): -20 mm 
ELOG V3.1.5-fc6679b