HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 16 of 29  Not logged in ELOG logo
ID Date Author Category Subjectdown Year Text Attachments
  4   Wed Feb 6 10:16:09 2019 Laszlo VargaGeneralStudy on scraping A publication on scraping systems suggested
by Siegbert. 
In the study they have used cylindrical "high-quality"
 1-s2.0-0168583X88900122-main.pdf 
  367   Fri May 21 15:20:54 2021 Rui-Jiu ChenRunsStop DAQ2021Sergey is optimizing beam cycle.    
  63   Thu Mar 19 09:43:28 2020 LaszloGeneralStatus of the ESR After two days of tuning the beam, yesterday
evening (~8pm), it was found out that within
one ESR pattern using the new control system
  
  422   Mon May 24 17:23:41 2021 Pierre-Michel, EnisGeneralStatus of gas-target cooling2021Around 17:15 cooling had "unknown status 6"
At 17:21 cooling: "pumping in progress"
Around 17:41 cooling had "unknown status
  
  266   Tue Mar 24 10:59:18 2020 JanCalibrationSources - Specifications We used the following sources:

[B]Am241[/B] (OM666) [GSI - Uwe]
 Pb-210-1.pdf241Am_Uwe.pdf133Ba_low.pdf133Ba_hi.pdf 
  17   Tue Jul 9 15:26:59 2019 Yuanming XingSimulationsSimulated Rutherford scattering distribution on detector Simulated Rutherford scattering distribution
on detector
 6MeV.png7MeV.png8MeV.png 
  199   Sun Mar 22 17:47:27 2020 Laszlo Si, Xrays target density spectra during 118Te afternoon measurement We got 30 counts out of this afternoon 118Te
run on our Si TargetON histo.
That 1 count at bin (6,10) I dont understand.
 End_of_118Te_runs.pngtarget_density_during_118Te_afternoon_runs.png 
  390   Sat May 22 17:13:48 2021 LaszloDetectorsSi position changed2021Si was moved from -25 mm to -19 mm before
run 0072.
  
  203   Sun Mar 22 19:15:03 2020 Laszlo Si moved out of the ring, high voltage is switched off     
  35   Fri Feb 21 11:29:02 2020 LaszloGeneralShift plan https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0   
  69   Fri Mar 20 01:22:23 2020 ShahabRunsSetting for Gas target Setting for the machines.  IMG_20200320_012048.jpg 
  391   Sat May 22 17:15:26 2021 LaszloGeneralScraper position2021We found the beam axis with the scraper to
be -17.5 mm.
The Scraper position set to +12.5 mm, 30
  
  239   Mon Mar 23 11:32:42 2020 LaszloGeneralSIS went down again run101 is stopped   
  232   Mon Mar 23 09:33:11 2020 LaszloGeneralSIS failure again! run096 is stopped   
  210   Mon Mar 23 00:13:25 2020 LaszloGeneralSIS and ESR beam currents    2020-03-23_00-09-48-737.png2020-03-23_00-21-43-581.png 
  554   Sun May 30 00:14:58 2021 Oliver, DiegoGeneralSIS Pattern changed2021The pattern in SIS was changed so that we
get more injections into ESR. Before HTD
had 9 seconds which resulted in a timeout
  
  217   Mon Mar 23 03:07:11 2020 ShahabRunsSIS Kicker problem After calling ESR on-call duty (M. Steck)
he confirmed that the ESR is fine and suspected
the SIS kicker modules.
 IMG_20200323_021051.jpg 
  223   Mon Mar 23 05:59:01 2020 ShahabRunsSIS Kicker  SIS Kicker seems to be working properly. but
we have to see how regularly it will work.
  
  363   Fri May 21 11:55:24 2021 JanDetectorsSI MSCF settings v12021attached are the settings for all MSCFs.
Settings are optimized for DSSD only, not
BaF!
 setting_test.1621590878 
  133   Sat Mar 21 15:26:49 2020 LaszloGeneralSCRAPER is ON use again Yuri puts back the scraper (Egelhof 1 - GE01DD1IG)
into position = +19. (where it was in the
evening)
  
ELOG V3.1.5-fc6679b