HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 19 of 29  Not logged in ELOG logo
ID Date Author Categorydown Subject Year Text Attachments
  368   Fri May 21 19:20:54 2021 LaszloGeneralmisalignment in the pattern2021for some reason the event number of the target
ON and OFF was misaligned with the pattern.
This means that the last few runs (run53,
  
  386   Sat May 22 14:53:34 2021 Beatriz et al.GeneralDSSD Movement2021DSSSD moved to the most in position in order
to try to scrape the beam with the scraper.
  
  387   Sat May 22 16:28:10 2021 LaszloGeneralDSSSD movement2021The DSSSD is moved back to its measurement
position(-25mm).
  
  388   Sat May 22 16:29:07 2021 Laszlo et al.Generalcoolers are back2021we can measure again.

(please write a detailed description if needed)
  
  391   Sat May 22 17:15:26 2021 LaszloGeneralScraper position2021We found the beam axis with the scraper to
be -17.5 mm.
The Scraper position set to +12.5 mm, 30
  
  395   Sat May 22 20:46:19 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021The scraper was moved into 2.5mm in absolute
which corresponds to 20mm away from the beam
axis.
  
  400   Sat May 22 22:29:48 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021The scraper was moved into 7.5 mm in absolute
which corresponds to 25 mm away from the
beam axis.
  
  404   Sun May 23 02:16:47 2021 LaszloGeneralquick comparison between different scraping positions2021So far we did 3 scraping positions:
- 30mm away from beam axis (lmd72-75)
- 25mm away from beam axis (lmd78-80)
 scraping_30.pngscraping_25.pngscraping_20.png 
  411   Sun May 23 15:36:10 2021 Rui-Jiu Chen& AlexGeneralAll shifts until Monday morning (24th May) have been cancelled. 2021All shifts until Monday morning (24th May)
have been cancelled. 
Next update on further situation (in particular
  
  422   Mon May 24 17:23:41 2021 Pierre-Michel, EnisGeneralStatus of gas-target cooling2021Around 17:15 cooling had "unknown status 6"
At 17:21 cooling: "pumping in progress"
Around 17:41 cooling had "unknown status
  
  424   Mon May 24 17:48:04 2021 ErikaGeneralFRS shiftplan, name abbreviations and phone list2021FRS shift plan for this week:
[img]elog:424/1[/img]
 FRS_shiftplan.pngFRS_name_abbreviations.PNGFRS_phone_list.PNG 
  439   Tue May 25 08:36:15 2021 JanGenerallessons learned20211. before using stoch. cooling in ESR, boot
and update the windows PC
2. better diagnostics for low energy/intensity
  
  447   Tue May 25 13:49:51 2021 Oliver, Diego, JanGeneralNo Beam2021No beam from 13:49:00 until    
  471   Wed May 26 15:30:03 2021 Ragan, ThanassisGeneralChanging the beam energy 2021The ESR team is changing the beam energy to
6 MeV/u.
  
  474   Wed May 26 18:37:34 2021 Ragan, ThanassisGeneralOptimization target bump/overlapp2021| bump position | X ray bdt ON | Si rate ON
|
---------------------------------------------
  
  475   Wed May 26 19:08:17 2021 Ragan, ThanassisGeneralCooler down2021We stopped data taking as the electron cooler
is down.
  
  490   Thu May 27 08:26:15 2021 Yuri, BeatrizGeneralOptimisation beam position on target and scraper position2021Optimised overlap with the target by shifting
the beam from -11.5 to 12.8 mm. This lead
to an increase of the DSSSD rate of a factor
  
  521   Fri May 28 14:14:31 2021 LaszloGeneralAlvarez failure at 10:30 28:05:20212021    
  552   Sat May 29 23:05:52 2021 Oliver, DiegoGeneralNo Beam2021Due to a radioprotection issue in CaveA there
is no beam. We wait for the radioprotection
shift to arrive...
  
  554   Sun May 30 00:14:58 2021 Oliver, DiegoGeneralSIS Pattern changed2021The pattern in SIS was changed so that we
get more injections into ESR. Before HTD
had 9 seconds which resulted in a timeout
  
ELOG V3.1.5-fc6679b