  368   Fri May 21 19:20:54 2021 LaszloGeneralmisalignment in the pattern2021
for some reason the event number of the target ON and OFF was misaligned with the pattern.
This means that the last few runs (run53, run52...) measured not in the target on phase but one before (at 10 instead of 11). Therefore, with these 
runs we measured the TargetOFF phase instead TargetON (that is why the pg peak seem to disappear...)
  386   Sat May 22 14:53:34 2021 Beatriz et al.GeneralDSSD Movement2021
DSSSD moved to the most in position in order to try to scrape the beam with the scraper.
  387   Sat May 22 16:28:10 2021 LaszloGeneralDSSSD movement2021
The DSSSD is moved back to its measurement position(-25mm).
  388   Sat May 22 16:29:07 2021 Laszlo et al.Generalcoolers are back2021
we can measure again.

(please write a detailed description if needed)
  391   Sat May 22 17:15:26 2021 LaszloGeneralScraper position2021
We found the beam axis with the scraper to be -17.5 mm.
The Scraper position set to +12.5 mm, 30 mm relative from the beam.
  395   Sat May 22 20:46:19 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021
The scraper was moved into 2.5mm in absolute which corresponds to 20mm away from the beam axis.

Pressluft Antriebe

Position 1
GE01DD1IG (SC12) 2.5 mm

Position 2
GE01DD1IG (SC9) 2.5 mm
  400   Sat May 22 22:29:48 2021 Laszlo, Pierre.Michel, EnisGeneralnew scraper position2021
The scraper was moved into 7.5 mm in absolute which corresponds to 25 mm away from the beam axis.

Pressluft Antriebe

Position 1
GE01DD1IG (SC12) 7.5 mm

Position 2
GE01DD1IG (SC9) 7.5 mm
  404   Sun May 23 02:16:47 2021 LaszloGeneralquick comparison between different scraping positions2021
So far we did 3 scraping positions:
- 30mm away from beam axis (lmd72-75)
- 25mm away from beam axis (lmd78-80)
- 20mm away from beam axis (lmd76-77)

below one can see the comparison of the scrapings for the DSSSD spectrum. Please mind the different amount of data collected
Attachment 1: scraping_30.png
scraping_30.png
Attachment 2: scraping_25.png
scraping_25.png
Attachment 3: scraping_20.png
scraping_20.png
  411   Sun May 23 15:36:10 2021 Rui-Jiu Chen& AlexGeneralAll shifts until Monday morning (24th May) have been cancelled. 2021
All shifts until Monday morning (24th May) have been cancelled. 
Next update on further situation (in particular concerning the morning shift on Monday) will be given tonight .
  422   Mon May 24 17:23:41 2021 Pierre-Michel, EnisGeneralStatus of gas-target cooling2021
Around 17:15 cooling had "unknown status 6"
At 17:21 cooling: "pumping in progress"
Around 17:41 cooling had "unknown status 6"

At 18:16 "unkown status 0"
At 18:21 "ok"

At 19:26 "unknown status 0"
At 19:31 "ok"
  424   Mon May 24 17:48:04 2021 ErikaGeneralFRS shiftplan, name abbreviations and phone list2021
FRS shift plan for this week:


Name abbreviations:


Phone numbers:
  439   Tue May 25 08:36:15 2021 JanGenerallessons learned2021
1. before using stoch. cooling in ESR, boot and update the windows PC
2. better diagnostics for low energy/intensity beam-target overlapp in ESR is needed (either a clever analysis or a new detector)
more to come
  447   Tue May 25 13:49:51 2021 Oliver, Diego, JanGeneralNo Beam2021
No beam from 13:49:00 until 
  471   Wed May 26 15:30:03 2021 Ragan, ThanassisGeneralChanging the beam energy 2021
The ESR team is changing the beam energy to 6 MeV/u.
  474   Wed May 26 18:37:34 2021 Ragan, ThanassisGeneralOptimization target bump/overlapp2021
| bump position | X ray bdt ON | Si rate ON |
---------------------------------------------
| -11.5         | 120          | 4-5        |
| -10.5         | 100          | 5          |
| -9.5          | 85           | 5          |
| -12.5         | 100          | 6          |

-11.5 bump position is taken for the data taking.
  475   Wed May 26 19:08:17 2021 Ragan, ThanassisGeneralCooler down2021
We stopped data taking as the electron cooler is down.
  490   Thu May 27 08:26:15 2021 Yuri, BeatrizGeneralOptimisation beam position on target and scraper position2021
Optimised overlap with the target by shifting the beam from -11.5 to 12.8 mm. This lead to an increase of the DSSSD rate of a factor between 2.5 or 3.
Adjusted scraper position  by looking at x-ray rate and move it from +1 to +2. 
  521   Fri May 28 14:14:31 2021 LaszloGeneralAlvarez failure at 10:30 28:05:20212021
  552   Sat May 29 23:05:52 2021 Oliver, DiegoGeneralNo Beam2021
Due to a radioprotection issue in CaveA there is no beam. We wait for the radioprotection shift to arrive...

Beam back at 23:18
  554   Sun May 30 00:14:58 2021 Oliver, DiegoGeneralSIS Pattern changed2021
The pattern in SIS was changed so that we get more injections into ESR. Before HTD had 9 seconds which resulted in a timeout in the ESR. Now HTD has 10 seconds which improved a lot...