ID |
Date |
Author |
Category |
Subject |
Year |
154
|
Sat Mar 21 23:24:09 2020 |
Dima, Pierre | Runs | run entry - run068 | |
open file : run068
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 22:54 , first file: run068_0001.lmd
run stop at : , last file: run067_0xxx.lmd
_______________________________________________________________________________
time: 23:24 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 4 Hz
Xray_90: 53 Hz
Xray_145: 16 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.05 uA
SIS particles before: ~2.3e9
ESR current at injection: 21 uA
ESR particles after decel.:
Target ON density: 5.41e13
copy and repeat the above (below the line) every 30 minutes |
153
|
Sat Mar 21 23:19:14 2020 |
Jan | Analysis | 118Te52+ on H2-target - Xray spectrum 90 degree | |
The attached spectrum is for the 90 degree X-ray detector taken for about 3 hours with 118Te52+.
We see two peaks at ~29 keV (K-alpha) and 44 keV (K-REC).
The resolution is about 1.5 keV, and the signal-to-background ratio is also really bad.
The increase of background events at higher E might be induced by Compton scattering of a high E gamma ray from the BaF detectors, which are active and sit close by (not anymore). |
152
|
Sat Mar 21 23:12:38 2020 |
Jan | Detectors | removed BaF detectors | |
After run 67 and before run 68, the BaF detectors have been removed in order to reduce the Compton background in the x-ray detectors. |
151
|
Sat Mar 21 23:07:00 2020 |
Laszlo | General | 1672. MCP file was (recoils) was not closed | |
1672. MCP file was (recoils) was not closed when we refilled the Xrays and did the cable change of 90 and 145 xrays
These stored in lxg1299 local disk |
150
|
Sat Mar 21 22:59:09 2020 |
Sergiy,Ruijiu | Runs | run entry - run068 | |
open file : run068
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 22:54 , first file: run068_0001.lmd
run stop at : , last file: run067_0xxx.lmd
_______________________________________________________________________________
time: 22:54 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 1 Hz
Xray_90: 48 Hz
Xray_145: 17 Hz
BaF_OR: Hz
Si voltage: 60.01 V
Si leakage current: 4.06 uA
SIS particles before: ~3.0e9
ESR particles at injection: n.n.
ESR particles after decel.:
Target ON density: 5.23e13
copy and repeat the above (below the line) every 30 minutes |
149
|
Sat Mar 21 22:57:28 2020 |
Laszlo, Jan | DAQ | changing cables of the Xray 90 and 145 | |
Energy signals of 90 and 145 degree detector have been checked and exchanged
They were connected to the wrong ADC channel.
Now
E_Xray2 and t_Xray2 should belong to 90 degree
E_Xray3 and t_Xray3 belong to 145 degree |
148
|
Sat Mar 21 21:41:29 2020 |
Sergiy,Ruijiu | Runs | run entry - run067 | |
open file : run067
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 20:41 , first file: run067_0001.lmd
run stop at 21:40 , last file: run066_0xxx.lmd
_______________________________________________________________________________
time: 21:12 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 4 Hz
Xray_90: 29 Hz
Xray_145: 25 Hz
BaF_OR: Hz
Si voltage: 60.01 V
Si leakage current: 4.08 uA
SIS particles before: ~2.5e9
ESR particles at injection: n.n.
ESR particles after decel.:
Target ON density: 6.e13
copy and repeat the above (below the line) every 30 minutes |
147
|
Sat Mar 21 21:36:06 2020 |
Jan | Runs | target incident | |
in run 66 or 67 we had a single ESR cycle for which the target didn't switch off for new injection and deceleration etc.
Very likely the DAQ also didn't get an OFF signal and collected OFF data to the TRIGGER=1 (ON data) branch.
As a consequence we collected about ~100 counts on the Si in one shot, which was about ~20 counts before this shot.
attached:
1.picture of the target density and beam current at this time. |
146
|
Sat Mar 21 21:11:46 2020 |
Sergiy,Ruijiu | Runs | run entry - run067 | |
open file : run067
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 20:41 , first file: run067_0001.lmd
run stop at 20:39 , last file: run066_0xxx.lmd
_______________________________________________________________________________
time: 21:12 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 4 Hz
Xray_90: 29 Hz
Xray_145: 25 Hz
BaF_OR: Hz
Si voltage: 60.01 V
Si leakage current: 4.08 uA
SIS particles before: ~2.5e9
ESR particles at injection: n.n.
ESR particles after decel.:
Target ON density: 6.e13
copy and repeat the above (below the line) every 30 minutes |
145
|
Sat Mar 21 20:39:38 2020 |
Sergiy,Ruijiu | Runs | run entry - run067 | |
open file : run067
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 20:41 , first file: run067_0001.lmd
run stop at 20:39 , last file: run066_0xxx.lmd
_______________________________________________________________________________
time: 20:41 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 2 Hz
Xray_90: 43 Hz
Xray_145: 35 Hz
BaF_OR: Hz
Si voltage: 60.01 V
Si leakage current: 4.08 uA
SIS particles before: ~2.9e9
ESR particles at injection: n.n.
ESR particles after decel.:
Target ON density: 6.43e13
copy and repeat the above (below the line) every 30 minutes |
144
|
Sat Mar 21 20:11:59 2020 |
Sergiy | Runs | run entry - run066 | |
open file : run066
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 19:42 , first file: run066_0001.lmd
run stop at , last file: run065_0xxx.lmd
_______________________________________________________________________________
time: 20:12 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 4 Hz
Xray_90: 28 Hz
Xray_145: 14 Hz
BaF_OR: Hz
Si voltage: 60.01 V
Si leakage current: 4.08 uA
SIS particles before: ~2.9e9
ESR particles at injection: n.n.
ESR particles after decel.:
Target ON density: 6.5e13
copy and repeat the above (below the line) every 30 minutes |
143
|
Sat Mar 21 19:42:33 2020 |
Sergiy | Runs | run entry - run066 | |
open file : run066
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 19:42 , first file: run066_0001.lmd
run stop at , last file: run065_0xxx.lmd
_______________________________________________________________________________
time: 19:42 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 2 Hz
Xray_90: 27 Hz
Xray_145: 19 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.07 uA
SIS particles before: ~3.1e9
ESR particles at injection: n.n.
ESR particles after decel.:
Target ON density: 6.9e13
copy and repeat the above (below the line) every 30 minutes |
142
|
Sat Mar 21 19:11:33 2020 |
Sergiy | Runs | run entry - run065 | |
open file : run065
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 18:42 , first file: run065_0001.lmd
run stop at 19:42 , last file: run064_0xxx.lmd
_______________________________________________________________________________
time: 19:12 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 5 Hz
Xray_90: 22 Hz
Xray_145: 22 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.08 uA
SIS particles before: ~2.6e9
ESR particles at injection: n.n.
ESR particles after decel.:
Target ON density: 6.9e13
copy and repeat the above (below the line) every 30 minutes |
141
|
Sat Mar 21 18:42:43 2020 |
Sergiy | Runs | run entry - run065 | |
open file : run065
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 18:42 , first file: run065_0001.lmd
run stop at , last file: run064_0xxx.lmd
_______________________________________________________________________________
time: 18:42 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 3 Hz
Xray_90: 30 Hz
Xray_145: 15 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.08 uA
SIS particles before: ~3.1e9
ESR particles at injection: n.n.
ESR particles after decel.:
Target ON density: 6.8e13
copy and repeat the above (below the line) every 30 minutes |
140
|
Sat Mar 21 18:13:22 2020 |
Shahab | General | rough comparison gas target off and on | |
rough comparison of life time at 10 MeV/u when target off with on. more noise in background means weaker signal. |
139
|
Sat Mar 21 18:13:22 2020 |
Sergiy | Runs | run entry - run064 | |
open file : run064
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.
Detector position (Si): -24 mm
run start at 17:42 , first file: run064_0001.lmd
run stop at , last file: run064_0xxx.lmd
_______________________________________________________________________________
time: 18:12 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 1 Hz
Xray_90: 35 Hz
Xray_145: 14 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.10 uA
SIS particles before: ~3.1e9
ESR particles at injection: n.n.
ESR particles after decel.:
Target ON density: 7e13
copy and repeat the above (below the line) every 30 minutes |
138
|
Sat Mar 21 17:34:10 2020 |
Sergiy | General | Recoils | |
We started recording the data from the recoils using the MCP from Pierre-Michael's experiment.
17:30 File opened: recoils1662.lmd.
data is stored at lxg1299: data.local2/hillenbrand/Laszlo |
137
|
Sat Mar 21 17:32:12 2020 |
Sergiy | Runs | run entry - run064 | |
open file : run064
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON. The target is back ON at 7e13.
Detector position (Si): -24 mm
run start at 17:30 , first file: run064_0001.lmd
run stop at 15:04:21 , last file: run064_0xxx.lmd
_______________________________________________________________________________
time: 17:30 pm.
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 2 Hz
Xray_90: 25 Hz
Xray_145: 30 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.10 uA
SIS particles before: ~2e9
ESR particles at injection: estimated ~1e6
ESR particles after decel.:
Target ON density: 1.52e13
copy and repeat the above (below the line) every 30 minutes |
136
|
Sat Mar 21 17:30:08 2020 |
Sergiy | Runs | run entry - run064 | |
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 17:30 , first file: run064_0001.lmd
run stop at xx:xx , last file: run0xx_0xxx.lmd
_______________________________________________________________________________
time: 17:30 .
ON Rates
Si_X: 0 Hz
Si_Y: 0 Hz
Xray_35: 2-3 Hz
Xray_90: 29 Hz
Xray_145: 17 Hz
BaF_OR: Hz
Si voltage: 60.02 V
Si leakage current: 4.04 uA
SIS particles before: 2.5e9
ESR particles at injection: estimated ~1.3e6
ESR particles after decel.:
Target ON density: 1.34e13
copy and repeat the above (below the line) every 30 minutes |
135
|
Sat Mar 21 17:21:57 2020 |
Laszlo | General | new Target density | |
Ulli and Nikos managed to set the target density to ~7E13 at 51K temperature
The cycle is checked again, it seems fine. |