HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 22 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
IDdown Date Author Category Subject Year Text Attachments
  154   Sat Mar 21 23:24:09 2020 Dima, PierreRunsrun entry - run068 open file : run068

beam: 118Te52+
  
  153   Sat Mar 21 23:19:14 2020 JanAnalysis118Te52+ on H2-target - Xray spectrum 90 degree The attached spectrum is for the 90 degree
X-ray detector taken for about 3 hours with
118Te52+.
 90_deg_118Te_runs64to66.png 
  152   Sat Mar 21 23:12:38 2020 JanDetectorsremoved BaF detectors After run 67 and before run 68, the BaF detectors
have been removed in order to reduce the
Compton background in the x-ray detectors.
  
  151   Sat Mar 21 23:07:00 2020 LaszloGeneral1672. MCP file was (recoils) was not closed 1672. MCP file was  (recoils) was not closed
when we refilled the Xrays and did the cable
change of 90 and 145 xrays
  
  150   Sat Mar 21 22:59:09 2020 Sergiy,Ruijiu Runsrun entry - run068 open file : run068

beam: 118Te52+
  
  149   Sat Mar 21 22:57:28 2020 Laszlo, JanDAQchanging cables of the Xray 90 and 145 Energy signals of 90 and 145 degree detector
have been checked and exchanged
They were connected to the wrong ADC channel.
  
  148   Sat Mar 21 21:41:29 2020 Sergiy,Ruijiu Runsrun entry - run067 open file : run067

beam: 118Te52+
  
  147   Sat Mar 21 21:36:06 2020 JanRunstarget incident in run 66 or 67 we had a single ESR cycle
for which the target didn't switch off for
new injection and deceleration etc.
 run67_target_incident.png 
  146   Sat Mar 21 21:11:46 2020 Sergiy,Ruijiu Runsrun entry - run067 open file : run067

beam: 118Te52+
  
  145   Sat Mar 21 20:39:38 2020 Sergiy,Ruijiu Runsrun entry - run067 open file : run067

beam: 118Te52+
  
  144   Sat Mar 21 20:11:59 2020 SergiyRunsrun entry - run066 open file : run066

beam: 118Te52+
  
  143   Sat Mar 21 19:42:33 2020 SergiyRunsrun entry - run066 open file : run066

beam: 118Te52+
  
  142   Sat Mar 21 19:11:33 2020 SergiyRunsrun entry - run065 open file : run065

beam: 118Te52+
  
  141   Sat Mar 21 18:42:43 2020 SergiyRunsrun entry - run065 open file : run065

beam: 118Te52+
  
  140   Sat Mar 21 18:13:22 2020 ShahabGeneralrough comparison gas target off and on rough comparison of life time at 10 MeV/u
when target off with on. more noise in background
means weaker signal.
 target_effect.jpg 
  139   Sat Mar 21 18:13:22 2020 SergiyRunsrun entry - run064 open file : run064

beam: 118Te52+
  
  138   Sat Mar 21 17:34:10 2020 SergiyGeneralRecoils 
We started recording the data from the recoils
using the MCP from Pierre-Michael's experiment.
  
  137   Sat Mar 21 17:32:12 2020 SergiyRunsrun entry - run064 open file : run064

beam: 118Te52+
  
  136   Sat Mar 21 17:30:08 2020 SergiyRunsrun entry - run064 beam: 118Te52+
energy: 10 MeV/u
  
  135   Sat Mar 21 17:21:57 2020 LaszloGeneralnew Target density Ulli and Nikos managed to set the target density
to ~7E13  at 51K temperature
  
ELOG V3.1.5-fc6679b