calculation of the energy loss through the carbon foil 11 mg
Missing shots due to HSI-RFQ.
Shift started at 7 a.m. no beam yet.
Dream team Dima and Shahab started their mission!
used prophelper to move GE01DD1_S. it did not touch the primary beam until 0 position.