HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+  Not logged in ELOG logo
Message ID: 111     Entry time: Wed Apr 6 15:19:29 2022
Author: Svea, Shahab 
Category: Accelerator 
Subject: 5s delay implemented before injection 
Operators have informed us that for better stability and operation (and cooperation with HHT), and after discussing with Sergey, they have introduced 5s delay "Wartezeit RESET" before every injection.

We have to observe this new behavior and in case it needs further optimizations, we have to inform the operators.
ELOG V3.1.5-fc6679b