HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Nuclear hyperfine mixing in 229Th89+  Not logged in ELOG logo
Message ID: 126     Entry time: Thu Apr 7 04:48:58 2022
Author:  
Category:  
Subject: ToDo's for 07.04. 
Some ToDo's for the next shift:
- Work on  Laser stabilisation 2nd stage in the ESR
- Mesytec power supply of the xuv-detector crashed and needs to be restarted in the ESR. Simply turning it the crate off and on again)!!
- Fix wavemeter fluctuates
- Compare MBS event size of DAQ 1 ("by laser group") and DAQ 2 ("by Carsten"), DAQ 1 data size was ~2 times larger than DAQ 2 data size.
- Use lmd-files measured last night to test Go4-Analysis.
- Practice measurement procedure with beam, see Message ID: 124.
ELOG V3.1.5-fc6679b