HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  Nuclear hyperfine mixing in 229Th89+  Not logged in ELOG logo
Message ID: 16     Entry time: Wed Mar 16 08:31:52 2022
Author: Kristian 
Category: DAQ 
Subject: Check cables and timing 
Konstantin and I generated a signal in the Messhütte and sent it to the ESR. 
There, we used a 44m BNC cable that was sufficently long to reach all detectors. 
Our signal was connected instead of the PMT/PD. Hence, it was a roundtrip measurement.
In the Messhütte we checked the delay between the generated signal.

PD North 1460(1)ns
PD South 1455(1)ns
Particle North 1239(1)ns
Particle South 1179(1)ns
UV North 1322(1)ns
UV Middle 1322(1)ns
UV South 1321(1)ns
Cu 1322(1)ns

We also checked the time delay of our cable to the detectors by measuring the reflection of the unterminated cable. 
Function generator to detector: 1520(5)/2 ns
Function generator to scope: 5.1(5) ns
Total: 765(3) ns
ELOG V3.1.5-fc6679b