HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+  Not logged in ELOG logo
Message ID: 163     Entry time: Fri Apr 8 14:14:28 2022
Author: Kristian 
Category: DAQ 
Subject: Delay of bunch RF 
The bunch HF is now fed through a delay to shift the stop trigger relative to the PMT signal. The delay generator is placed directly after the CFG and before splitting the signal for the two DAQs. The relative timing of both DAQs was not changed.
ELOG V3.1.5-fc6679b