HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
|
Nuclear hyperfine mixing in 229Th89+ |
Not logged in |
|
|
Message ID: 169
Entry time: Fri Apr 8 17:44:25 2022
|
Author: |
Konstantin |
Category: |
Calibration |
Subject: |
Final Timing |
|
|
We measured the timing for the laser bunch synchronization. A summary is given below.
detector | time till common stop [bins] | time till common stop [ns]
|
PD North | 28 | 93.33 |
PD South | 63 | 210 |
Particle Detector South | 14 | 46.67 |
Particle Detector North | 94 | 313.33 |
PMT middle | 119 | 396.67
|
Using all numbers, the difference between the center of the photodiodes and PMT middle is
given by 245ns, which corresponds to the half revolution period of 256 ns. Difference between the
center of both photodiodes and particle detector south is given by 105 ns.
The delay for the laser trigger is now set correctly. |