HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Nuclear hyperfine mixing in 229Th89+  Not logged in ELOG logo
Message ID: 169     Entry time: Fri Apr 8 17:44:25 2022
Author: Konstantin 
Category: Calibration 
Subject: Final Timing 
We measured the timing for the laser bunch synchronization. A summary is given below.

detector time till common stop [bins] time till common stop [ns]
PD North 28 93.33
PD South 63 210
Particle Detector South 14 46.67
Particle Detector North 94 313.33
PMT middle 119 396.67


Using all numbers, the difference between the center of the photodiodes and PMT middle is
given by 245ns, which corresponds to the half revolution period of 256 ns. Difference between the
center of both photodiodes and particle detector south is given by 105 ns.
The delay for the laser trigger is now set correctly.
ELOG V3.1.5-fc6679b