HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Nuclear hyperfine mixing in 229Th89+  Not logged in ELOG logo
Message ID: 228     Entry time: Thu Apr 14 12:27:18 2022
Author: Sebastian, Max 
Category: Detectors 
Subject: Connection to XUV / Cu reestablished! 
The connection to the XUV and Cu were lost during the nightshift.

The XUV detector was in the park position,
BUT the Cu mirror was in the "Measurement position" (moved in / active).

This could be one of the main problems that we had much lesser ion beam intensity since the UNILAC and SIS18 failures last night.
ELOG V3.1.5-fc6679b