HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Nuclear hyperfine mixing in 229Th89+  Not logged in ELOG logo
Message ID: 40     Entry time: Thu Mar 31 11:49:54 2022
Author: Konstantin 
Category: Detectors 
Subject: HV-Supply of particle detectors  
We cross-checked the cabeling of the particle detectors north and south. Particle detector south is connected to channel HV5 at the yellow "ESR Messplatz III" patch-panel. Particle detector north is connected to channel K5 at the green "ESR Messplatz II" patch-panel. Red high voltage power-supply is used to control the voltage.
ELOG V3.1.5-fc6679b