HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Nuclear hyperfine mixing in 229Th89+  Not logged in ELOG logo
Message ID: 49     Entry time: Fri Apr 1 01:57:12 2022
Author: Kristian 
Category: DAQ 
Subject: Timing 
with bunched primary beam (bunching frequency 1.94070 MHz) we have strong PMT (mid) and particle detector signal. Time between both detectors was measured (in 3.3ns bins)

Particle Det ;  PMT (rising edge)
305 ; 256
227 ; 179
150 ; 102
73 ; 24


PD and PMT signal is second plot. Laser timing was not adjusted jet since it will change with Th beam. 
Attachment 1: Particle-PMT_Mid.png  16 kB  | Hide | Hide all
Particle-PMT_Mid.png
Attachment 2: PMT-PD.png  29 kB  Uploaded Fri Apr 1 03:07:43 2022  | Hide | Hide all
PMT-PD.png
Attachment 3: IMG_20220331_235846.jpg  413 kB  Uploaded Fri Apr 1 19:34:41 2022  | Hide | Hide all
IMG_20220331_235846.jpg
ELOG V3.1.5-fc6679b