HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
|
Nuclear hyperfine mixing in 229Th89+ |
Not logged in |
|
|
Message ID: 49
Entry time: Fri Apr 1 01:57:12 2022
|
Author: |
Kristian |
Category: |
DAQ |
Subject: |
Timing |
|
|
with bunched primary beam (bunching frequency 1.94070 MHz) we have strong PMT (mid) and particle detector signal. Time between both detectors was measured (in 3.3ns bins)
Particle Det ; PMT (rising edge)
305 ; 256
227 ; 179
150 ; 102
73 ; 24
PD and PMT signal is second plot. Laser timing was not adjusted jet since it will change with Th beam. |
|
|
|
|
|