with bunched primary beam (bunching frequency 1.94070 MHz) we have strong PMT (mid) and particle detector signal. Time between both detectors was measured (in 3.3ns bins) Particle Det ; PMT (rising edge) 305 ; 256 227 ; 179 150 ; 102 73 ; 24 PD and PMT signal is second plot. Laser timing was not adjusted jet since it will change with Th beam.