| 
HOME
ESR
EXPERIMENTS
LABS etc
 | 
| 
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
E0075
E0203_E0018
E0052_2025
 | 
|   Nuclear hyperfine mixing in 229Th89+  | 
Not logged in | 
  | 
   | 
| 
Message ID: 49
    Entry time: Fri Apr  1 01:57:12 2022
 |  
| Author: | 
Kristian  | 
 | Category: | 
DAQ  | 
 | Subject: | 
Timing  | 
 
  |  
 
 | 
with bunched primary beam (bunching frequency 1.94070 MHz) we have strong PMT (mid) and particle detector signal. Time between both detectors was measured (in 3.3ns bins)
Particle Det ;  PMT (rising edge)
305 ; 256
227 ; 179
150 ; 102
73 ; 24
PD and PMT signal is second plot. Laser timing was not adjusted jet since it will change with Th beam.   | 
 | 
 
 | 
 | 
 | 
 
 |