gamma_t = 1.3955
Br(72Ge) corresponds to 6.79575 Tm
E (Kr) at Br(72Ge) = 392.9 MeV/u
ESIS = 467.45 MeV/u (pre-drilling, after 1.8 g/cm2 target)
ESIS = 440.98 MeV/u (final energy for 72Ge)
-during setup, a 20 mm offset in the TE line was observed. Beam centered via changing the Br of the beamline (~4 MeV/u up). Optimized pre-drilling transmission ~20% (with thick target) |