HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay  Not logged in ELOG logo
Message ID: 45     Entry time: Fri May 7 12:37:35 2021
Author: Ragan, Andrew, Yuri, Alex 
Category: General 
Subject: Back with beam  
We are back with the beam in the ESR since 12:30
ALL SCRAPERS ARE IN THE ORIGINAL POSITIONS
E02DS3HG = - 35 mm
EEXDS2HA = - 25 mm
EEXDS1HA = - 25 mm
E01DS_H = - 40 mm

For E02DS3HG a reset in the control system needed to be done.
ELOG V3.1.5-fc6679b