If gamma_t = 1.3955 Tm stays, we will need Brho = 6.21902 Tm for 70Se.
The corresponding ESR Brho setting will be a bit shifted.
It then requires E-SIS = 446.55 MeV/u to get 70Se to this Brho and gamma_t.
For pre-drilling with 78Kr beam at same Brho use 416.70 MeV/u.
But we could also make a quick try without tuning before, just change all energies. |