HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay  Not logged in ELOG logo
Message ID: 86     Entry time: Sun May 9 01:49:25 2021
Author: Helmut, Sergey, Yuri 
Category: Accelerator 
Subject: change to 52Mn 
It was done in steps:
isochronous 52Mn should come at Brho = 6.28239 Tm (gamma_t = 1.3955).
set ESR to m/q and E for 52Mn, 368.41 MeV/u

1.) predrilling 1st try
- set beamline to E, q for 52Mn and m = 51.9319 u by trim
- E-SIS = 422.1 MeV/u
but then not centred on profile grids, with thick Be target in 
-15mm on TE4DGC also not on Lecuhttarget, not good


2.) pre-predrilling 2nd try
don't set beamline for 52Mn but define it as 78Kr, in trim mass back to 77.92 u.
insert Cu-40 mg/cm² and inject, just use dE = 1.5 MeV/u in stripper for SIS-energy (343.353 + 1.5) MeV/u 
optimise a bit, then keep beamline energy set as 78Kr36+ beam the same. 

3.) pre-drilling 422.1 MeV/u in SIS
insert Be target and optimise with kicker and septum angle,
energy also tried but back to old value, reache 6 - 7 % transmission

4.) change E-SIS to 440.7 MeV/u to get 52Mn in ESR at gamma_t
ELOG V3.1.5-fc6679b