HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  nuclear two-photon decay, Page 1 of 12  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authorup Category Subject
  33   Fri May 7 06:53:56 2021 Akash, LilianaAnalysisSome plots
Some plots of statistics up to now
  68   Sat May 8 07:14:00 2021 Akash, Nic, Jelena, ZsoltGeneralMorning shift entry
Things look ok. No settings have been changed...

Analysis attempts are going on...
  69   Sat May 8 07:34:08 2021 Akash, Nic, Jelena, ZsoltGeneralZoom has its own mind
Zoom kicked us all out... we managed to get back in...screen sharing is back on.
  70   Sat May 8 08:12:02 2021 Akash, Nic, Jelena, ZsoltGeneralSIS, ESR time structure changes
The structure of SIS extraction seems to have changed a little...also for ESR injection.

In the span of a few minutes both the structures changed again...to look more like in the previous shifts, with lesser or no negative component.
  71   Sat May 8 08:16:08 2021 Akash, Nic, Jelena, ZsoltAnalysisNight shift analysis
(Jelena has analysed these data files)

E143_245MHz_2021.05.08.00* (-s 5.0 -t 0.5)  (2021.05.08.09.01.11.png)

E143_245MHz_2021.05.08.01* (-s 5.0 -t 0.5)  (2021.05.08.08.56.05.png)

E143_245MHz_2021.05.08.02* (-s 5.0 -t 0.5)  (2021.05.08.08.44.10.png)

E143_245MHz_2021.05.08.03* (-s 5.0 -t 0.5)  (2021.05.08.08.33.46.png)

E143_245MHz_2021.05.08.04* (-s 5.0 -t 0.5)  (2021.05.08.08.26.49.png)  

E143_245MHz_2021.05.08.05* (-s 5.0 -t 0.5)  (2021.05.08.07.58.22.png)

E143_245MHz_2021.05.08.06* (-s 5.0 -t 0.5)  (2021.05.08.08.12.14.png)

E143_245MHz_2021.05.08.07* (-s 5.0 -t 0.5)  (2021.05.08.09.12.53.png)

-------------------------------------------------------------------------

E143_410MHz_2021.05.08.00* (-s 5.0 -t 0.5)  (2021.05.08.10.20.39.png)

E143_410MHz_2021.05.08.01* (-s 5.0 -t 0.5)  (2021.05.08.10.16.46.png)

E143_410MHz_2021.05.08.02* (-s 5.0 -t 0.5)  (2021.05.08.10.13.09.png)

E143_410MHz_2021.05.08.03* (-s 5.0 -t 0.5)  (2021.05.08.10.07.05.png)

E143_410MHz_2021.05.08.04* (-s 5.0 -t 0.5)  (2021.05.08.10.04.05.png)

E143_410MHz_2021.05.08.05* (-s 5.0 -t 0.5)  (2021.05.08.09.51.12.png)

E143_410MHz_2021.05.08.06* (-s 5.0 -t 0.5)  (2021.05.08.09.45.12.png)

E143_410MHz_2021.05.08.07* (-s 5.0 -t 0.5)  (2021.05.08.09.38.33.png)
  72   Sat May 8 08:44:32 2021 Akash, Nic, Jelena, ZsoltAcceleratorNo Beam!
08.43am: Beam stopped. HKR looking into it. Reason: they mentioned they don't know yet!

10.10am: SIS resumed operations. However, there are some issues with magnet power supplies for ESR and hence we still don't have beam. HKR member went to look for power supply expert.

10.15am: There were some random triggers coming from ESR, which resulted in files being written. To avoid this, the scope trig (both scopes) were taken out. As soon as the beam comes in 'properly', I will reconnect the trig in to the scopes (-akash).

10.40am: They sent something to ESR but it does not make sense...so HKR has called an ESR expert (Sergey).

11.30am: Yuri is here and trying to sort out the issue- no data being written yet.
  73   Sat May 8 10:51:41 2021 Akash, Nic, Jelena, ZsoltCalibrationESR settings seem different
Settings don't look the same...so we are not yet writing files unless sure.
  82   Sat May 8 21:42:26 2021 AllRunsStop72Ge
  83   Sat May 8 21:42:51 2021 AllAccelerator Set up for 52Mn
Details will follow
E(Mn) = 368.41 MeV/u
  169   Thu Jul 1 16:27:57 2021 Andrew NicGeneralNTCAP parameters
The latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000233
 p:\E143\iq\IQ_2021-06-30_23-27-34\0001138
2. The rest space on the drive "p:\" : 30,4TByte
  170   Thu Jul 1 16:47:15 2021 Andrew NicRunsFrequency shift
The freqency suddenly shifted at time 16:11:47 and remained shifted until now 

The ESR status in the monitor stayed blue. No obvious sign that a magnet was down. The operators are checking

Sergey telephoned, he is also not sure but suggests stopping starting the ESR. We will wait for Yuri
  181   Thu Jul 1 21:15:01 2021 Andrew NicDAQNTCAP Status
The latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000299
 p:\E143\iq\IQ_2021-06-30_23-27-34\0001462
2. The rest space on the drive "p:\" : 29,1TByte
  172   Thu Jul 1 18:01:52 2021 Andrew Nic ShahabDAQChange triggers to 10%
Change the triggers to 10%. Last files with 50/50:
410MhZ 2021-.07.01.17.56.12.936
245MhZ 2021.07.01.18.02.16.938 
  179   Thu Jul 1 20:35:21 2021 Andrew Nic ShahabDAQAcquisition stopped
Checking if signal can be further amplified 

Last files:
245MHz 2021.07.01.20.36.11.218
410MHz 2021.07.01.20.35.46.847
  47   Fri May 7 14:33:23 2021 Andrew Ragan Yuri GeneralBeam is back
  175   Thu Jul 1 18:54:44 2021 Andrew, NicGeneralNTCap Status
The latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000267
 p:\E143\iq\IQ_2021-06-30_23-27-34\0001305
2. The rest space on the drive "p:\" : 29,8TByte
  36   Fri May 7 08:04:22 2021 Carlo Bruno, Desislava KalaydjievaAnalysis7:00 - 14:00 analysis shift
(See
https://triumfoffice365-my.sharepoint.com/:w:/g/personal/dillmann_triumf_ca/Eb_LCp7yTx5Bgc8TO8khJmEBWeS-ycdPRnG02wQout-fgQ?rtime=3n3A3xMR2Ug
for remote shifter instructions. To be updated/corrected by the experts)

08:00 Analysed data from 6 am to 7 am  (Note file names are one hour behind).
Using e143_analyzer.py -t 0.5 E143-245MHz-2021.05.07.05.*
See attachments 1,2,3

08:17 Analysed data from 7am to 8am (Note file names are still one hour behind)
As above.
See attachments 4,5,6

Analysed data from 8am to 9am (Note file names are still one hour behind)
As above.
See attachment 7

At 8:50 Yury changes trigger on scope from 50% to 1% (minimum value).
We should now have the beginning of the injection as well, and isomers should appear at 0.1 s

9:35 Lost beam from SIS

09:45 Analysed data from 9am to 9:30 am (Note file names are still one hour behind)
These are the first data with the new trigger settings
As above
See attachment 8

11:50 Beam is back, scraper being optimised.
12:30 Scraper optimisation complete.

13:00 Analysed data from 12:30 to 12:45 roughly.
Attach 9 - default code. -t 0.5
Attach 10 - new untested code with skip function. See Slack#analysis. -t 0.5 -s 0.2
Attach 11 - as 10, log scale on the y

13:48 Analysed data from to 12:30 to 13:35
-t 0.5 Attach 12
-t 1 Attach 13 (log y) 

14:05 Lost beam in ESR

14:30 Analysed data from 13:00 to 14:00 before we lost beam.
-t 0.2 -s 0.1
Attach 13 & 14

14:35 Beam is back 

15:00 Shift handed over to AG and CJC
  59   Fri May 7 22:00:36 2021 ChrisAcceleratorbrief beam loss
Brief interruption in beam, ~21:42-21:51.
  60   Fri May 7 22:48:33 2021 ChrisGeneralstill running...
In anticipation of the imminent shift change, a snapshot of how things look.
  122   Mon May 10 00:41:20 2021 Chris CAcceleratorno beam
Beam gone ~0:34.
Working on getting it back.
Back in business ~0:57.
ELOG V3.1.5-fc6679b