HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay, Page 7 of 12  Not logged in ELOG logo
ID Date Authordown Category Subject
  216   Fri Jul 2 17:31:04 2021 LilianaGeneralstatus
at 17:20 intensity was suddenly reduced. 
Operators checked. Intensity was a bit low and fluctuating for a while (8e8 to 1e9)
Intensity (1.5e9) was recovered at 18:16
  217   Fri Jul 2 19:06:18 2021 LilianaDAQNTCAP status
The latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000600
 p:\E143\iq\IQ_2021-06-30_23-27-34\0002931
2. The rest space on the drive "p:\" : 23,4 TByte
  219   Fri Jul 2 20:01:16 2021 LilianaRunsSome plots from the Br setting
Attachment 1: 410MHz-2021.07.02.17.58.30.204.tiq.png
410MHz-2021.07.02.17.58.30.204.tiq.png
Attachment 2: 410MHz-2021.07.02.19.34.51.034.tiq.png
410MHz-2021.07.02.19.34.51.034.tiq.png
Attachment 3: 410MHz-2021.07.02.19.17.29.696.tiq.png
410MHz-2021.07.02.19.17.29.696.tiq.png
Attachment 4: 410MHz-2021.07.02.19.12.36.926.tiq.png
410MHz-2021.07.02.19.12.36.926.tiq.png
Attachment 5: 410MHz-2021.07.02.19.06.21.919.tiq.png
410MHz-2021.07.02.19.06.21.919.tiq.png
Attachment 6: 410MHz-2021.07.02.18.20.30.054.tiq.png
410MHz-2021.07.02.18.20.30.054.tiq.png
  221   Fri Jul 2 21:07:31 2021 LilianaDAQNTCAP status
The latest recorded tdms files:
 p:\E143\sc\SC_2021-06-30_23-27-45\0000627
 p:\E143\iq\IQ_2021-06-30_23-27-34\0003062
2. The rest space on the drive "p:\" : 22,9 TByte
  141   Tue Jun 29 21:12:15 2021 Kanika, ShahabRunsMoving the resonance frequency of the 245 MHz resonator
moving in the plungers:

before: 400
after: 200
Attachment 1: e143_resonance_change_2.PNG
e143_resonance_change_2.PNG
  142   Tue Jun 29 21:15:01 2021 Kanika, ShahabRunslost beam problem Unilac
cooling water in UNILAC is out
  50   Fri May 7 17:02:51 2021 Kanika, Sergey, Yuri, Wolfram, Michael, ShahabRunsnew sextupole setting 2
There is new sextupole settings, but the scrapers remain like last night (Helmut setting last night.)
  51   Fri May 7 17:12:14 2021 Kanika, Sergey, Yuri, Wolfram, Michael, ShahabRunsEnergy change -6 MeV/u
changed the energy down to 435 MeV/u
  52   Fri May 7 17:12:52 2021 Kanika, Sergey, Yuri, Wolfram, Michael, ShahabRunstrigger time back to 50%
changed trigger time back to 50%

last file with 1% trigger: 

245 MHZ 2021.05.07.16.07.03.493
410 MHz 2021.05.07.17.07.21.104


p.s. remember the 245 Analyzer has a 1 hour offset in time stamp because of daylight saving time in win10 setting
  53   Fri May 7 17:35:22 2021 Kanika, Sergey, Yuri, Wolfram, Michael, ShahabRunsEnergy change +6 MeV/u
We will now go up in energy to 447 MeV (+6 MeV) from the original energy

last file name with previous energy:

245: 2021.05.07.16.33.47.178
410: 2021.07.05.17.34.04.780
  54   Fri May 7 18:08:35 2021 Kanika, Sergey, Yuri, Wolfram, Michael, ShahabRunsgoing back to the original energy
going back to the original energy 441 MeV/u

last filenames with the previous energy:

245: 2021.05.07.17.07.00.543
410: 2021.05.07.18.07.18.037
  55   Fri May 7 18:43:13 2021 Kanika, Michael, ShahabRunscave M experiment needs more spills
our pattern causes beam loss while scanning the biological probes in the Cave M bio experiment. They loose every other spill due to high request rate from ESR.

For the next 2 hours, the operators have changed the spill pattern that as long as they are scanning , we get only every 1 minute, otherwise we get our 15 seconds as usual.

after two hours this situation should be tuned back to the original spill pattern.
Attachment 1: rep.jpg
rep.jpg
  56   Fri May 7 19:56:10 2021 Kanika, Michael, ShahabRunsZOOM session restart
restart zoom session
  57   Fri May 7 20:28:32 2021 Kanika, Michael, ShahabAnalysisSome pictures from the 410 detector
some pics.
Attachment 1: E143-410MHz-2021.05.07.20.21.32.783.tiq.png
E143-410MHz-2021.05.07.20.21.32.783.tiq.png
Attachment 2: E143-410MHz-2021.05.07.20.21.44.827.tiq.png
E143-410MHz-2021.05.07.20.21.44.827.tiq.png
Attachment 3: E143-410MHz-2021.05.07.20.21.56.869.tiq.png
E143-410MHz-2021.05.07.20.21.56.869.tiq.png
Attachment 4: E143-410MHz-2021.05.07.20.22.08.911.tiq.png
E143-410MHz-2021.05.07.20.22.08.911.tiq.png
Attachment 5: E143-410MHz-2021.05.07.20.22.20.952.tiq.png
E143-410MHz-2021.05.07.20.22.20.952.tiq.png
Attachment 6: E143-410MHz-2021.05.07.20.22.32.993.tiq.png
E143-410MHz-2021.05.07.20.22.32.993.tiq.png
Attachment 7: E143-410MHz-2021.05.07.20.22.45.037.tiq.png
E143-410MHz-2021.05.07.20.22.45.037.tiq.png
Attachment 8: E143-410MHz-2021.05.07.20.22.59.920.tiq.png
E143-410MHz-2021.05.07.20.22.59.920.tiq.png
Attachment 9: E143-410MHz-2021.05.07.20.23.17.103.tiq.png
E143-410MHz-2021.05.07.20.23.17.103.tiq.png
  58   Fri May 7 20:34:27 2021 Kanika, Michael, ShahabRunsback to 15 sec recording
now we are going back to 15 sec operation. Cave M (bio) operation is over
  117   Sun May 9 23:28:25 2021 Kanika, Alex, Wolfram, Helmut, ShahabRunsreturn with the Ge setting of the last night
starting filenames:

E143-410MHz-2021.05.09.23.28.24.018.tiq

E143-245MHz-2021.05.09.22.28.12.904.tiq
  129   Mon May 10 06:16:31 2021 Kanika, Alex, ShahabRunsRecording broad band spectra with 410
doing some broadband spectra recording with the 410 MHz detector, for the purpose of future confirmation of identification lines.
  131   Mon May 10 06:35:58 2021 Kanika, Alex, ShahabRunsgoing back to shot by shot recording with 410 detector
going back to shot by shot recording with 410 detector
  123   Mon May 10 00:51:38 2021 Kanika, Alex, RuiJiuGeneralNo beam in SIS
The beam was lost in SIS about 5 mins ago due to the failure of HF cavities. Operators are trying to solve the problem.
  124   Mon May 10 01:01:59 2021 Kanika, Alex, RuiJiuGeneralBeam is back
The issue has been resolved and the beam is back since 00:56.
ELOG V3.1.5-fc6679b