HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  208Pb surrogate  Not logged in ELOG logo
Message ID: 2     Entry time: Wed Feb 9 21:34:58 2022
Author: Jan et al. 
Category: General 
Subject: ToDo @ GSI 
in the LAB:
- setup of DAQ in GSI network
- presetup of remote control (HV, DAQ, LN2, etc)
- particle detectors + source tests
- setup and test trigger logic

in ESR:
- xray detector installation + calib.
- LN2 cooling system
- telescope installation @ target
- recoil det. installation downstream target
- DAQ rack and cabling
- cabling documentation
ELOG V3.1.5-fc6679b